Basic and Detail Engineering Services
Layout, piping, utilities and process have to be designed together. Tipco's engineering team takes your plant from the first layout to detailed drawings and datasheets. As a machine manufacturer, we design around equipment we know how to build and commission.
What We Cover
Basic Engineering
- Study of products, batch sizes, space and budget
- Site visit and kick-off meeting
- Master plant layout and space optimisation
- Man and material movement plan
- Process scheme and basic P&ID
- Raw material and finished goods space allocation
- Equipment list and basic sizing
- Provision for future expansion
- Layout and scope for approval before detailing
Detail engineering
- Design frozen after basic layout approval
- Detailed P&ID for the process
- Equipment, pump, piping and valve layouts
- Electrical load and utilities capacity design
- Instrumentation, including load cells
- Automation and SCADA for the liquid process
- Powder conveying system design
- MS structure and mezzanine design
- Equipment datasheets and utility vendor evaluation
Our Layout Approach
Every Tipco layout is designed around how your plant will actually run, so space, material flow, weighing and future growth are planned together from the start.
Vertical layouts (G, G+1, G+2) to save floor space and use gravity
Space left for future expansion
Clean cable and pipe trays for easier service
Process vessels on structural supports with load cells
Liquid and powder conveying designed with the plant, not added later
Filling on the ground floor, clear of the process area
Where We Apply It
- New plants (greenfield), planned from a blank site
- Existing plants (brownfield): relayout and modernisation, reusing equipment that still works
- Shifting plans that move one mixer at a time, so production is disturbed as little as possible
- Expansion in phases, to match space and budget
Questions we hear most.
Yes, available as a standalone service.
Basic engineering fixes the plan: layout, scope, process scheme and equipment list for your approval. Detail engineering turns the approved plan into drawings, P&IDs, layouts and datasheets for execution.
Our offers typically give the basic layout within about 3 weeks of the order, followed by detail engineering. The timeline is agreed for each project.
Yes. We redesign layouts and piping, reuse equipment in good condition, and plan the shift to disturb production as little as possible.